Rail Group on Air: CHSRA’s Troubling Rail Bridge

Written by Bill Wilson, Engineering Editor; and Editor-in-Chief, Railway Track & Structures
image description

Railway Track & Structures’ Editor-in-Chief Bill Wilson talks to William Ibbs, a professor of civil engineering at the University of California at Berkeley, to get a feel for how the QC/QA process is supposed to work on bridge construction projects. Construction on the Road 27 bridge, owned by the California High-Speed Rail Authority, has been on pause since late last year after high-strength steel strands snapped.

Click here to listen to the podcast.

Categories: Commuter/Regional, Construction, Freight, High Performance, News, Passenger, Podcasts, Safety Tags: , , ,