City of Edmonton

Brightline covers 235 miles between Miami and Orlando. It launched the first phase of its South Florida operations in 2018, connecting Miami, Fort Lauderdale and West Palm Beach. Stations in Boca Raton and Aventura opened in 2022. Construction of its 170-mile, $6 billion phase two extension from West Palm Beach to Orlando began in 2019 and service launched in September 2023. (Brightline Photograph)

Transit Briefs: Brightline, Capital Line South LRT, GCRTA

Brightline, Florida’s private-sector passenger railroad, receives “investment-grade” ratings. Also, the city of Edmonton, Alberta, has selected its preferred bidder to design and build Phase 1 of the Capital Line South LRT Extension; and Greater Cleveland Regional Transit Authority (GCRTA) launches a new webpage for its Railcar Replacement Program.

Brightline, Florida’s private-sector passenger railroad, is planning a new station in the Treasure Coast region. On Oct. 26, it released an RFP to determine the location. (Brightline Photograph)

Transit Briefs: Brightline, City of Edmonton, Houston Metro, MassDOT, NYMTA

Brightline launches a Request for Proposals (RFP) for a new intercity passenger rail station in Florida’s Treasure Coast region. Also, the long-awaited Valley Line Southeast LRT will open next month in Edmonton, Alberta; Metropolitan Transit Authority of Harris County (Houston Metro) selects Jacobs as a transit-oriented development advisor; Massachusetts Department of Transportation (MassDOT) applies for U.S. Department of Transportation (USDOT) SMART grants for rail safety projects; and Fitch upgrades New York Metropolitan Transportation Authority’s (MTA) credit rating and rating outlook.

The Capital Line South LRT Extension will receive $268.71 million (C$333 million) in municipal funding for construction from Century Park to the Heritage Valley Park & Ride in Edmonton, Alberta.

Transit Briefs: Edmonton, LACMTA, San Diego MTS, Santa Clara VTA, TriMet

The Edmonton (Alberta) City Council approved municipal funding for the 2.8-mile (4.5-kilometer) Capital Line South LRT Extension. In addition, LACMTA finalized its 2021-24 Coordinated Public Transit-Human Services Transportation Plan; SANDAG and MTS unveiled the VA Medical Center Trolley Station; VTA is slated to receive $20 million from the state of California to help with recovery from the May 26 mass shooting; and TriMet was forced to suspend MAX service due to record-setting temperatures.

Valley Line West will run between 102nd Street downtown and Lewis Farms in west Edmonton, and offer 14 street-level stations and two elevated stations.

Edmonton Advances C$2.6B Valley Line West LRT Extension

The city of Edmonton (Alberta) announced that Marigold Infrastructure Partners (MIP) is the preferred proponent to design, build and partially finance its C$2.6-billion (US$1.98-billion), 14-kilometer (8.7-mile) Valley Line West light rail extension.