Amtrak

Virginia’s plans to expand Amtrak passenger rail service to Norfolk, Va., will be pursued without sacrificing Amtrak’s current route through the state’s Tidewater region, which terminates at Newport News, on…
Several Charlottesville, Va., residents gathered at the train station Oct. 7 to celebrate the one-year anniversary of the daily Lynchburg-to-Washington Amtrak train, which stops in Charlottesville.

Wisconsin Gov. Jim Doyle Tuesday announced that Talgo, Inc. (the U.S. subsidiary of Patentes Talgo, S.A.) will locate a U.S. “high speed” rail manufacturing and assembly facility in Milwaukee. Talgo, Inc. will acquire the former Tower Automotive site in the state’s largest city.

--> Wisconsin Gov. Jim Doyle Tuesday announced that Talgo, Inc. (the U.S. subsidiary of Patentes Talgo, S.A.) will locate a U.S. “high speed” rail manufacturing and assembly facility in Milwaukee. Talgo,…

The state of Wisconsin will purchase two 14-car train sets from Las Rozas, Spain-based Patentes Talgo SA to replace current equipment used in Amtrak’s Hiawatha Service between Milwaukee and Chicago. The agreement includes an option to buy two more trains if the state gets federal stimulus money to extend rail service from Milwaukee to Madison, the state capital.

--> The state of Wisconsin will purchase two 14-car train sets from Las Rozas, Spain-based Patentes Talgo SA to replace current equipment used in Amtrak’s Hiawatha Service between Milwaukee and Chicago.…
Amtrak President and CEO Joseph Boardman says U.S. passenger service will benefit more quickly from reliable, frequent operations, not from seeking top speeds of 200 mph or more in an…
Following an infusion of $1.3 billion in capital (over and above the $13 billion over five years authorized last year) and indirect access to $8 billion in state-administered funds under…

Northern California’s Capitol Corridor Joint Powers Authority (CCJPA) says it’s prepared to target up to $98 million in federal Stimulus Package funding to 10 “shovel-ready” projects, and has the list prepared for federal officials to evaluate March 9, when CCJPA representatives will be in Washington. Total cost of the projects involved is $144 million.

--> Northern California’s Capitol Corridor Joint Powers Authority (CCJPA) says it’s prepared to target up to $98 million in federal Stimulus Package funding to 10 “shovel-ready” projects, and has the list…

Annapolis, Md.-based ARINC Inc. will design and produce a supervisory control system and communications systems for the Long Island Rail Road’s Harold Interlocking Complex in Long Island City, N.Y.  Harold is among the busiest such complexes in the U.S., handling LIRR, New Jersey Transit, and Amtrak train movements as well as some freight activity.

--> Annapolis, Md.-based ARINC Inc. will design and produce a supervisory control system and communications systems for the Long Island Rail Road’s Harold Interlocking Complex in Long Island City, N.Y.  Harold is…
Miami International Airport began construction Monday of its 1.27-mile, $342 million MIA Mover line. The dual elevated guideway project will include two station stops while connecting the airport with Miami…
After years of postponements and delay, the 18-mile single-track rail route between Albany and Schenectady, N.Y., may finally be double-tracked in 2009, if the expected approval by the Capital District Regional Planning Committee later this month is backed by funding.

--> After years of postponements and delay, the 18-mile single-track rail route between Albany and Schenectady, N.Y., may finally be double-tracked in 2009, if the expected approval by the Capital District…
40
Page 40 of 41

Get the latest rail news

Rail news and analysis from Railway Age, IRJ and RT&S by email